1. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Ballabhgarh Division (Package-3 consisting Pali S/Divn) under Faridabad Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Reconductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs Implementation of Loss Reduction Works (under RDS Scheme) in Ballabhgarh Division (Package-3 consisting of Pali S/Divn) under Faridabad Circle
|
Value :
18.25 Cr
*
|
182.50 Mn
*
|
Due Date :
5 Days to go
|
14/05/2024
|
TID :70096803
Haryana
|
|
|
2. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Hansi Division (Package-2 consisting S/U Hansi and Narnaund S/Divns) under Hisar Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs. Implementation of LRP Works
|
Value :
15.14 Cr
*
|
151.42 Mn
*
|
Due Date :
5 Days to go
|
14/05/2024
|
TID :70096793
Haryana
|
|
|
3. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Mahendragarh Division (Package-2 consisting S/U Mahendragarh S/Divn) under Narnaul Circle which interalia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs. Implementation of Loss Reduction Works (under RDS Scheme) in Mahendragarh Division (Package-2 consisting of S/U Mahendragarh S/Divn) under Narnaul Circle
|
Value :
14.51 Cr
*
|
145.10 Mn
*
|
Due Date :
5 Days to go
|
14/05/2024
|
TID :68766941
Haryana
|
|
|
4. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Tohana Division (Package1 consisting City Tohana, Jakhal and Uklana S/Divns) under Fatehabad Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs Implementation of Loss Reduction Works (under RDS Scheme) in Tohana Division (Package-1 consisting of City Tohana, Jakhal and Uklana S/Divns) under Fatehabad Circle
|
Value :
13.61 Cr
*
|
136.18 Mn
*
|
Due Date :
5 Days to go
|
14/05/2024
|
TID :70096760
Haryana
|
|
|
5. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Sub-Urban Sirsa Division (Package-1 consisting Ellenabad S/Divn) under Sirsa Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Reconductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs.. Implementation of Loss Reduction Works (under RDS Scheme) in S/U Sirsa Division (Package-1 consisting of Ellenabad S/Divn) under Sirsa Circle
|
Value :
12.27 Cr
*
|
122.79 Mn
*
|
Due Date :
5 Days to go
|
14/05/2024
|
TID :70096802
Haryana
|
|
|
6. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Hansi Division (Package-1 consisting City Hansi, Sisai, Umra and Mundhal S/Divns) under Hisar Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Hansi Division (Package-1 consisting City Hansi, Sisai, Umra and Mundhal S/Divns) under Hisar Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs.. Implementation of LRP Works
|
Value :
12.17 Cr
*
|
121.71 Mn
*
|
Due Date :
5 Days to go
|
14/05/2024
|
TID :70096787
Haryana
|
|
|
7. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Sub-Urban Sirsa Division (Package-3 consisting Jeewan Nagar S/Divn) under Sirsa Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs Implementation of Loss Reduction Works (under RDS Scheme) in S/U Sirsa Division (Package-3 consisting of Jeewan Nagar S/Divn) under Sirsa Circle
|
Value :
10.64 Cr
*
|
106.40 Mn
*
|
Due Date :
5 Days to go
|
14/05/2024
|
TID :70096772
Haryana
|
|
|
8. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Dabwali Division (Package-2 consisting Kalanwali S/Divn) under Sirsa Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Reconductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs . Implementation of Loss Reduction Works (under RDS Scheme) in Dabwali Division (Package-2 consisting of Kalanwali S/Divn) under Sirsa Circle
|
Value :
10.10 Cr
*
|
101.03 Mn
*
|
Due Date :
5 Days to go
|
14/05/2024
|
TID :68766936
Haryana
|
|
|
9. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Sub-Urban Sirsa Division (Package-2 consisting Rania S/Divn) under Sirsa Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Reconductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs. Implementation of Loss Reduction Works (under RDS Scheme) in S/U Sirsa Division (Package-2 consisting of Rania S/Divn) under Sirsa Circle
|
Value :
9.11 Cr
*
|
91.15 Mn
*
|
Due Date :
5 Days to go
|
14/05/2024
|
TID :70096739
Haryana
|
|
|
10. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Ballabhgarh Division (Package-4 consisting Sub-Urban Ballabhgarh S/Divn) under Faridabad Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs.. Implementation of Loss Reduction Works (under RDS Scheme) in Ballabhgarh Division (Package-4 consisting of Sub Urban Ballabhgarh S/Divn) under Faridabad Circle
|
Value :
9.04 Cr
*
|
90.49 Mn
*
|
Due Date :
5 Days to go
|
14/05/2024
|
TID :70096756
Haryana
|
|
|